# My Development — Progress

![My Development — Progress](/docs-content/ae388add69-04-progress.png.webp)

**Navigation:** Home → My Development → Progress  
**Visibility:** personal and private unless the user approves a defined summary  
**Primary audience:** every user with active or completed development priorities

## Purpose

Progress shows longitudinal evidence of change against the user's own baseline. It helps answer whether accepted practices are being applied consistently and whether observed work outcomes are moving in the intended direction.

## Scope controls

Period chooses the analysis window. Behavior limits the page to selected priorities or practices. Meeting Scope controls which eligible meeting types contribute. Comparison selects the personal baseline or another permitted historical period; it never compares employees.

## Summary indicators

- **Decision closure** measures the proportion of relevant decisions with the required owner, date, and acceptance state.
- **Concise updates** measures use of the configured status-update structure and duration target where applicable.
- **Early blockers** counts blockers stated before their first observable delivery impact.
- **Practices completed** compares completed practices with the user's accepted plan.

Each indicator shows direction and change during the selected period. The value is based on eligible evidence and should be read with coverage and context.

## Main content

**Observed behavior trend** plots the selected indicators over time and marks important changes in evidence coverage. **Practice completion** separates completed, skipped, and planned practices. **Milestones** identifies first successful application, repeated application, and attainment of a target.

**Contribution balance** describes the kinds of observable contributions made—status and facts, questions, decisions, and facilitation. It is contextual and is not a productivity or performance score. **Most material evidence** shows representative positive, mixed, and contrary examples. **Next practices** turns gaps into specific actions for upcoming meetings.

## Actions

- Change period or comparison.
- Open an indicator to inspect its definition and eligible evidence.
- Open material evidence at the relevant timestamp or source.
- Record a practice as completed, skipped, or not applicable.
- Add a next practice to Today.
- Challenge an incorrectly attributed or interpreted evidence item.

## Recommended procedure

Use a period long enough to contain repeated opportunities. Review both improvement and contrary evidence, check coverage, and avoid drawing conclusions from a single meeting. If a practice is completed but the outcome does not improve, modify the practice rather than simply increasing its frequency.

## Related screens

[Growth Priorities](/documentation/packages/bnd-development/screens/home-my-development-growth-priorities), [Recommendations](/documentation/packages/bnd-development/screens/home-my-development-recommendations), and [Evidence & History](/documentation/packages/bnd-development/screens/home-my-development-evidence-and-history).
